Kinds of Time and Project Splits
Every entry you log in Tickmark says what the time was. Only work counts as worked time; breaks and personal time are kept apart so they never inflate hours on a project or a payslip.
Log time
Open Work Mode and click New entry (or press N). The Log time dialog starts with a switch for the kind of time:
| Kind of time | What it is for | Project and task |
|---|---|---|
| Work | Time spent on client or internal work | Pick a project and, optionally, a task |
| Break | Lunch, tea and other breaks | Not needed |
| Personal | Time away for personal reasons during the day | Not needed |
Set the start and end time, or pick a duration from the quick chips. The chips change with the kind of time: short ones for breaks, longer ones for work.
How breaks and personal time are paid
When you choose Break or Personal, the dialog shows a note under the time, starting Not counted as work, that explains what the entry means for pay before you save it:
- Breaks are covered by your contract’s daily break allowance. The note shows how much of the allowance is left today.
- Break time beyond the allowance, and personal time, is unpaid unless your day still reaches its contracted hours of work. Staying late makes it up.
- On a rest day or a leave day, nothing you declare is deducted.
- If your contract sets no hours to compare against, nothing is deducted.
- On a day-based contract, declared time on one day never costs more than half a day.
- If your personal time on a day passes half your contracted day, the dialog suggests a half-day leave instead, with a link to Apply for leave.
The amount in the note is an upper bound (“up to”), because the rest of the day can still make the time up.
Split time across projects
One block of time often belongs to more than one project, for example a call that covered two clients. When you log new work, you can split it instead of creating separate entries by hand:
Choose the first project
In Log time, choose Work and pick a project.
Click Split with another project
Pick the second project. Add more with + Add project, up to 10 projects in one split.
Adjust the shares
The time is shared equally to start with. Type a duration on any row to change its share, such as 1h 30m, 1:30, 45 (minutes) or 1.5 (hours); the rest is shared equally by the rows you haven’t typed in. Split equally puts the shares back to equal.
Save
Tickmark saves one entry per project, back to back, so the calendar shows each part of the block in its own colour.
If a task is linked, it has to belong to one of the projects in the split, and it is linked only to that project’s part. The dialog tells you when the shares don’t add up to the total time, and won’t save until they do. Splitting is only offered for new entries, not when you edit one.
Make a project required
Admins can require a project on every work entry from Settings → Worklog → Projects on work entries:
- With Work entries need a project switched on, Log time won’t save new work until a project is chosen. Breaks and personal time never need one.
- The Start Timer button in the Work Mode toolbar follows the same rule: pick a project when you start it, or the entry is refused when you stop.
- Entries from the floating timer are not blocked; if one is saved without a project, it is flagged on the Work Mode page instead.
- Entries already saved without a project are not changed.
Fix entries without a project
When any of your work entries in the week you’re viewing has no project, Work Mode shows a strip such as 3 work entries this week have no project, and those entries show No project on the calendar. Click Add projects to open a list of those entries and choose a project for each one without opening them one by one. Each choice saves straight away and changes only the project, not the time, so it works on locked days too.